Posted by venugopalan on November 03, 2000 at 02:04:03:
In Reply to: Improve Control with Regulatory Level Transformations posted by Don Snowden on July 29, 1999 at 09:25:24:
Mr.Don,
I do agree. A periodic monitoring of the controller performace is needed for
PID schemes, if they have to be tight. And the exercise that goes with it is
some times tedious.
Control experts, Shinskey and Luyben have categorically spelt out that controls should be simple. Then where do we practitioners of advanced controls stand.
Can smeone provide litereature survey about cost benefical aspect of MPCs